Endeavour Silver(EXK)
icon
搜索文档
Endeavour Silver Provides Pitarrilla Project Update
GlobeNewswire News Room· 2024-11-13 19:50
VANCOUVER, British Columbia, Nov. 13, 2024 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. (“Endeavour” or the “Company”) (NYSE: EXK; TSX: EDR) is pleased to report an update on the 2024 exploration and evaluation initiatives at its 100% owned Pitarrilla project. Engineering firms have been retained to commence technical studies for the basis of a future economic study. Since acquiring the Pitarrilla project in July 2022, Endeavour has re-logged historic drill core to further understand the geology and mineraliz ...
Endeavour Silver(EXK) - 2024 Q3 - Earnings Call Transcript
2024-11-06 04:27
财务数据和关键指标变化 - 公司在2024年第三季度的总收入为5300万美元,同比增长8%,受益于贵金属价格的上涨 [9] - 销售成本为4100万美元,同比下降12%,主要由于银销售量减少以及在Guanacevi采取的成本管理措施 [9][10] - 公司在第三季度报告净亏损1700万美元,而2023年第三季度的亏损为230万美元 [10] - 截至2024年9月30日,公司现金余额为5500万美元,流动资金为2900万美元 [11] 各条业务线数据和关键指标变化 - 第三季度银当量产量为160万盎司,其中银875,000盎司,黄金9,300盎司,符合2024年更新的生产指导 [7] - Terronera项目的表面建设在9月30日时已完成77%,至今已支出超过2.58亿美元,预计将在2024年第四季度投入生产 [8][12] 各个市场数据和关键指标变化 - 随着金价创下新高,公司的现金流和财务状况预计将继续受益于这些高价位 [5] - 银价有所下跌,但公司仍在努力维持生产和成本控制 [5] 公司战略和发展方向和行业竞争 - 公司计划在2025年将Terronera项目纳入生产线,预计将显著提升公司的生产能力 [8] - 公司在社区关系方面持续投入,支持当地发展项目,以确保获得社会许可 [15][21] 管理层对经营环境和未来前景的评论 - 管理层对当前的经营环境表示乐观,尽管面临设备故障的挑战,但团队在应对方面表现出色 [5][51] - 对于未来,管理层预计Terronera项目将为公司带来可观的现金流,并在2025年实现全面运营 [34][51] 其他重要信息 - 公司在第三季度完成了2500万美元的高级担保债务融资,用于Terronera项目 [11] - Terronera项目的建设进展顺利,预计将在2024年第四季度完成 [12] 问答环节所有提问和回答 问题: Terronera项目的员工招聘和培训情况 - 目前Terronera现场的员工人数超过750人,预计在全面运营时将达到500人以上 [18] - 公司在社区内开展了培训项目,吸引了大量当地居民参与 [24] 问题: Terronera项目的进展和潜在瓶颈 - 预计Terronera的启动过程将持续三个月,管理层对潜在瓶颈持乐观态度 [28][30] 问题: 2025年的现金成本和维持成本 - 预计2025年的现金管理费用将保持在800万到1000万美元之间 [25] 问题: Guanacevi的恢复进展 - Guanacevi的运营团队在修复工作中表现出色,预计将顺利恢复到正常水平 [41] 问题: Pitarilla项目的进展 - Pitarilla项目正在进行地下斜坡的推进,预计将在未来几周内发布相关进展 [48]
Endeavour Silver(EXK) - 2024 Q3 - Quarterly Report
2024-11-05 20:58
Endeavour Silver Corp. Management's Discussion & Analysis For the Three and Nine Months Ended September 30, 2024 MANAGEMENT'S DISCUSSION AND ANALYSIS For the periods ended September 30, 2024 This Management Discussion and Analysis ("MD&A") should be read in conjunction with the condensed consolidated interim financial statements of Endeavour Silver Corp. ("Endeavour" or "the Company") for the three and nine months ended September 30, 2024, and the related notes contained therein, which were prepared in acco ...
Endeavour Silver (EXK) Soars 6.6%: Is Further Upside Left in the Stock?
ZACKS· 2024-10-23 17:36
Endeavour Silver (EXK) shares soared 6.6% in the last trading session to close at $5.49. The move was backed by solid volume with far more shares changing hands than in a normal session. This compares to the stock's 41.9% gain over the past four weeks.Endeavour Silver’s share price has jumped on its announcement that the Terronera project’s mine development and surface construction has reached 77% completion.  More than $258 million of the project's budget has been spent. The Terronera mine, located in Jali ...
Endeavour Silver provides a Q3 2024 construction progress update on Terronera; the surface construction progress has reached 77% completion
GlobeNewswire News Room· 2024-10-21 18:50
文章核心观点 - 公司正在积极推进特罗内拉项目的建设进度 [1][2] - 项目建设进度已达77%,预计将于Q4开始调试系统 [4][9] - 项目建设主要集中在上部平台和尾矿库的建设,进展顺利 [5][6][7] - 公司持续关注当地社区,开展多项社会公益活动 [3] 项目建设进度 - 整体项目进度达77%,已投入2.58亿美元 [4] - 地下矿山开发持续推进,已开拓5,544米 [4] - 上部平台建设已完成90%,主要破碎机已投入使用 [5] - 下部平台和尾矿库建设正在紧张推进 [7] - 项目采购已完成99% [8] 下一步计划 - 预计于Q4开始调试系统,包括尾矿过滤、浮选等系统 [9] - 地下矿山开发将继续推进,计划于Q4开始生产 [9] - 尾矿库、尾矿过滤器和地下矿山开发是关键进度 [10]
Endeavour Silver Could Continue To Be Silver On Steroids
Seeking Alpha· 2024-10-11 01:45
The Hecht Commodity Report is one of the most comprehensive commodities reports available today from a top-ranked author in commodities, forex, and precious metals. My weekly report covers the market movements of over 29 different commodities and provides bullish, bearish, and neutral calls, directional trading recommendations, and actionable ideas for traders and investors. I am offering a free trial and discount to new subscribers for a limited time. He runs the investing group The Hecht Commodity Report ...
Endeavour Silver's Silver Production Decreases 14% Y/Y in Q3
ZACKS· 2024-10-10 01:48
Endeavour Silver Corporation (EXK) produced 1.6 million silver equivalent ounces in the third quarter of 2024, a 14% decline from the year-ago quarter due to reduced silver production at its mines, which offset higher gold output. Endeavour Silver's Silver Production Slips, Gold Rises Consolidated silver production fell 24% year over year to 874,717 million ounces. This was due to a reduced operating capacity at Guanaceví after the trunnion breakdown in August. Endeavour Silver, however, witnessed a 2% year ...
Endeavour Silver Reports Q3 2024 Production Results
GlobeNewswire News Room· 2024-10-08 18:50
VANCOUVER, British Columbia, Oct. 08, 2024 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. ("Endeavour" or the "Company") (NYSE: EXK; TSX: EDR) is pleased to report third quarter 2024 production of 874,717 silver ounces and 9,290 gold ounces, for silver equivalent1 ("AgEq") production of 1.6 million ounces. Total year-to-date production of 6.0 million AgEq ounces is tracking towards the updated 2024 production guidance of 7.3 million to 7.6 million AgEq ounces. All amounts are in U.S. dollars unless stated other ...
Endeavour Silver (EXK) Restarts Guanacevi Mill at Reduced Rate
ZACKS· 2024-08-20 23:15
Endeavour Silver Corp. (EXK) announced that processing resumed at the Guanacevi mine site following the completion of temporary modifications. On Aug 12, 2024, the company announced that the trunnion of the primary ball mill at the Guanacevi mill had failed, resulting in the suspension of material processing at the mill. Since then, EXK made modifications to the plant to repurpose one of the regrind mills as the primary ball mill. However, mining will continue at a reduced rate of 400 tons per day (tpd) dur ...
Endeavour Silver Provides Update on Guanacevi Trunnion Failure
GlobeNewswire News Room· 2024-08-19 18:50
VANCOUVER, British Columbia, Aug. 19, 2024 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. ("Endeavour" or the "Company") (NYSE: EXK; TSX: EDR) provides an update to the Guanacevi primary ball mill trunnion failure that was reported on August 12, 2024. Processing has resumed at the Guanacevi mine site. Temporary modifications have been completed within the plant to re-purpose one of the regrind mills as the primary ball mill which is currently milling at a rate of 400 tonnes per day (tpd). While the grinding cir ...