Cipher Mining (CIFR)
搜索文档
Why Cipher Mining Stock Rocketed 12% Higher on Wednesday
The Motley Fool· 2024-09-26 06:30
News of a facility acquisition inspired several analysts to wax positive about the company. Two new and glowing analyst takes on the future of Cipher Mining (CIFR 12.21%) were the news items that pushed the company's stock well higher on Wednesday. The Bitcoin miner's share price ballooned by more than 12% during the session, a far better performance than the S&P 500 index's 0.2% slump on the day. Acquisition news fuels optimism The pair of fresh takes came on the back of news that Cipher Mining had closed ...
Cipher Mining Announces the Closing of its Acquisition of Barber Lake 300 MW Data Center Site
GlobeNewswire News Room· 2024-09-24 21:05
Completed acquisition of Barber Lake data center site, which includes 250 acres of land in West Texas, a newly constructed high-to-mid voltage substation, approvals for 300 MW, and agreements necessary to participate in the ERCOT market Site acquisition funded with the proceeds from bitcoin inventory sales NEW YORK, Sept. 24, 2024 (GLOBE NEWSWIRE) -- Cipher Mining Inc. (NASDAQ: CIFR) ("Cipher" or the "Company") today announced it has completed the acquisition of the recently announced Barber Lake site in We ...
Cipher Mining Inc. (CIFR) Rises Yet Lags Behind Market: Some Facts Worth Knowing
ZACKS· 2024-09-20 07:06
The most recent trading session ended with Cipher Mining Inc. (CIFR) standing at $2.93, reflecting a +1.03% shift from the previouse trading day's closing. The stock fell short of the S&P 500, which registered a gain of 1.7% for the day. Meanwhile, the Dow gained 1.26%, and the Nasdaq, a tech-heavy index, added 2.51%. The company's stock has dropped by 28.4% in the past month, falling short of the Business Services sector's gain of 6.45% and the S&P 500's gain of 1.27%. The upcoming earnings release of Ciph ...
Bitfury Group Announces Completion of Distribution of Cipher Mining Inc. Shares
Prnewswire· 2024-09-11 21:00
核心观点 - Bitfury集团完成了今年早些时候宣布的分配计划的最后一步将其持有的约960万股Cipher Mining Inc股票进行转移 [1] 分配计划相关 - 作为分配计划最后一步的一部分Bitfury将约710万股Cipher普通股转让给参与其长期激励计划的前员工、现任员工、承包商和顾问以换取过去提供的服务剩余约250万股在公开市场出售以支付与转让相关的预扣税义务 [2] - 分配计划完成后V3 Holding Limited作为Bitfury的主要所有者实益拥有Cipher约30%的已发行股份 [2] - 表格展示了分配计划最后阶段前后Bitfury在Cipher股份中的大致总体所有权集中度 [3] 公司人员评论 - Bitfury首席执行官Val Vavilov表示对执行分配计划感到自豪这有助于奖励员工等且使Cipher拥有更多元化的股东基础并能更好地利用机会 [4] 公司简介 - Bitfury是全球领先的全方位区块链技术公司自2011年成立以来在比特币挖矿等方面发展出一系列产品和服务 [5]
Cipher Mining Announces August 2024 Operational Update
GlobeNewswire News Room· 2024-09-04 06:05
NEW YORK, Sept. 04, 2024 (GLOBE NEWSWIRE) -- Cipher Mining Inc. (NASDAQ:CIFR) ("Cipher" or the "Company") today released its unaudited production and operations update for August 2024. Key Highlights | --- | --- | |----------------------|-------------| | | | | Key Metrics | August 2024 | | BTC Mined1 | 160 | | BTC Sold | 136 | | BTC Held | 2,284 | | Deployed Mining Rigs | 76,000 | 1 Includes August power sales estimates (based on current meter data and nodal prices) equivalent to 9 bitcoin (using month-end ...
Cipher Mining to Participate in the 4th Annual Needham Virtual Crypto Conference
GlobeNewswire News Room· 2024-08-29 04:05
NEW YORK, Aug. 28, 2024 (GLOBE NEWSWIRE) -- Cipher Mining Inc. (NASDAQ: CIFR) ("Cipher" or the "Company"), a U.S.-based Bitcoin mining company, today announced it will participate in the 4th Annual Needham Virtual Crypto Conference on September 5, 2024. Cipher's CEO, Tyler Page, will be participating in a virtual fireside chat to discuss the Company's recent Q2 earnings, growth plans, and the convergence of HPC and bitcoin mining. Details of the Event: Event: 4th Annual Needham Virtual Crypto Conference Dat ...
Cipher Mining Announces Acquisition of New 300 MW Data Center Site in West Texas
GlobeNewswire News Room· 2024-08-28 04:10
The immediately available 250-acre site includes a newly constructed high-to-mid voltage substation, approvals for 300 MW, and agreements necessary to participate in the ERCOT market New site is equally well-suited for HPC infrastructure and bitcoin mining Company's aggregate data center portfolio now exceeds 2.5 GW NEW YORK, Aug. 27, 2024 (GLOBE NEWSWIRE) -- Cipher Mining Inc. (NASDAQ: CIFR) ("Cipher" or the "Company") today announced it has entered into a term sheet to acquire a new site in West Texas for ...
Cipher Mining (CIFR) - 2024 Q2 - Earnings Call Transcript
2024-08-14 00:15
财务数据和关键指标变化 - 第二季度净亏损1500万美元,环比下降138%,同比下降16% [36] - 第二季度收入3700万美元,环比下降24%,同比增长18% [36] - 第二季度成本收入下降4%,主要归功于Odessa的固定电价合同 [37] - 第二季度公司持有2200枚比特币,较年初780枚大幅增加 [46][47] 各条业务线数据和关键指标变化 - 第二季度自有矿机算力达到8.7EH/s,计划到年底提升至13.5EH/s [11][12] - 第二季度平均每枚比特币的全部电力成本为15,004美元,创行业最低 [25] - Odessa矿场占公司总产出的86%,每枚比特币电力成本为23,563美元 [30] - 合资矿场Bear和Chief占公司总产出的14%,每枚比特币电力成本为28,784美元 [31] 各个市场数据和关键指标变化 - 公司正在开发新的1.7GW矿场项目,覆盖主要市场趋势,包括比特币网络持续增长和AI数据中心的快速发展 [16][17] 公司战略和发展方向及行业竞争 - 公司将启动HPC基础设施业务,利用自身在数据中心建设和运营方面的优势,成为该领域的市场领导者 [18][19][20][21] - 公司未来将在比特币挖矿和HPC基础设施两大业务线之间保持灵活平衡,以最大化股东价值 [21] - 公司通过提前介入开发阶段获取优质矿场项目,避免与竞争对手在已建成矿场上的激烈竞争 [14][15] 管理层对经营环境和未来前景的评论 - 管理层对比特币网络和AI数据中心未来增长前景持乐观态度,认为公司在这些领域拥有独特优势 [16][17] - 管理层认为公司在数据中心建设和运营方面的经验和能力,以及充足的资金支持,将使其成为HPC基础设施领域的市场领导者 [18][19][20] - 管理层表示,公司将继续保持灵活的资本配置策略,根据市场环境动态评估各种融资方式 [39] 其他重要信息 - 公司Odessa矿场获得Uptime Institute运营管理认证,成为行业标杆 [19][27] - 公司计划在2025年建成容量达35EH/s的Black Pearl矿场,并在2027年建成容量达200MW的Reveille矿场 [22][23] 问答环节重要的提问和回答 问题1 **分析师提问** 分析师询问公司在HPC业务方面的资本配置策略,以及如何平衡对比特币挖矿业务的投资需求 [112] **公司回答** 公司表示HPC业务属高资本密集型,将主要通过债务融资方式进行投资,并可能设立独立的开发公司 [114][115][116][117][118][119] 问题2 **分析师提问** 分析师询问公司在新矿场项目开发方面的具体计划和时间表 [79][80] **公司回答** 公司表示正在与潜在租户和融资方进行深入洽谈,预计未来2-3年内将陆续开发新的1.7GW矿场项目 [121][122][123][124][125]
Cipher Mining (CIFR) - 2024 Q2 - Quarterly Report
2024-08-13 21:19
财务表现 - 比特币矿业在奥德萨设施共开采1,477枚比特币,收入8,490万美元,平均每枚比特币价格约57,500美元[182] - 收入增加主要由于比特币价格上涨,但部分被2024年4月减半的影响所抵消[182] - 营业成本增加主要由于维护费用增加,因奥德萨设施已完全投入运营[183] - 人工成本增加主要由于员工人数增加和股份支付增加[184] - 折旧和摊销增加主要由于2023年底新增资产投入使用,以及将矿机使用年限从5年缩短至3年[186] - 衍生资产公允价值变动收益增加2,930万美元,主要由于电力市场远期曲线变化[187] - 比特币公允价值变动收益增加2,420万美元,主要由于持有的比特币数量和价格上涨[190] 融资活动 - 公司通过"股票直接发行"融资方式获得净收益约9,590万美元[198] - 公司有意并有能力出售所持有的比特币以满足运营和资本需求[200] 基础设施建设 - 公司与Luminant ET Services Company LLC签订了一系列协议,包括租赁协议,用于建设支持公司计划运营的基础设施[208] - 租赁协议包含两个租赁组成部分,将作为单一租赁组成部分进行会计处理[209] - 租赁协议自2022年11月22日开始,初始期限为5年,可续期,融资由Luminant附属公司提供[210] - 2023年8月23日,公司与Luminant签订了租赁协议的第二次修订,修改了付款计划,每月支付本金和利息共计1970万美元[211,212] - 租赁期结束时,变电站将以二级市场价格出售给Luminant的附属公司Vistra Operations Company, LLC[213] 会计政策 - 公司提供了一种非GAAP财务指标"Adjusted Earnings",剔除了折旧摊销、衍生资产公允价值变动、股份支付等影响[214,215,216] - 公司为新兴成长公司,可延迟采用新的会计准则,但将于2024年底失去此资格,需遵守404b条款的审计要求[219,220]
Cipher Mining (CIFR) - 2024 Q2 - Earnings Call Presentation
2024-08-13 21:12
业绩总结 - 2024年第二季度的收入为3700万美元,较2023年第二季度的3100万美元增长了19%[20][22] - 2024年第二季度的GAAP净收益为-1500万美元,GAAP每股收益为-0.05美元[21] - 2024年第一季度的调整后收益为6300万美元,调整后每股收益为0.21美元[20] 用户数据 - 2024年6月30日的比特币挖矿收入为36,808千美元,较2024年3月31日下降24%[23] - 2024年6月30日的净亏损为15,291千美元,较2024年3月31日下降138%[25] - 2024年截至2023年6月30日,净收入为24,609千美元,较上年同期的净亏损17,751千美元有所改善[32] 未来展望 - 截至2024年7月31日,Cipher预计到2024年第三季度末将达到约9.3 EH/s的总算力,算力效率约为27.0 J/TH/s[6] - 当前自挖矿算力为约8.7 EH/s,预计到2024年底将达到约13.5 EH/s,到2025年将达到约35.0 EH/s[8][9] - Black Pearl数据中心预计在2025年第二季度启用,预计算力为约21.5 EH/s,电力容量为300 MW[13] 新产品和新技术研发 - Cipher正在开发四个新的北美站点,预计总容量可达1.7 GW,计划在2027-2028年启用[11] - Odessa站的当前运营算力为约6.9 EH/s,预计到2024年底将达到约11.3 EH/s[18] - Alborz、Bear和Chief站的运营算力为约3.7 EH/s,2024年迄今为止已开采约384 BTC[18] 财务状况 - 2024年6月30日的总成本和运营费用为52,979千美元,较2024年3月31日增加3,821%[23] - 2024年6月30日的股东权益总额为690,771千美元,较2023年12月31日增加40.5%[28] - 2024年6月30日的现金及现金等价物为122,557千美元,较2023年12月31日增加42%[28] 现金流和资本支出 - 经营活动中使用的净现金为51,988千美元,较上年同期的27,796千美元增加[32] - 投资活动中使用的净现金为62,313千美元,较上年同期的18,038千美元显著增加[32] - 融资活动中提供的净现金为150,753千美元,较上年同期的428千美元大幅上升[32] 其他信息 - 2024年6月30日的比特币资产为138,079千美元,较2023年12月31日增加318%[28] - 2024年6月30日的利息收入为1,053千美元,较2024年3月31日增加34%[23] - 2024年6月30日的摊销和折旧费用为20,251千美元,较2024年3月31日增加17%[23]